The building inspection and a timber pest inspection in one visit and one booking.
The building component follows AS 4349.1 and the timber pest component AS 4349.3. The pest component sets down the evidence and the conducive conditions present that day. It treats nothing and certifies nothing about the property being pest free.
0 checkpoints across 0 areas on a standard Box Hill building and pest inspection. On a site under construction we need the lot open and the builder told we are attending. Where a stage is not complete we record that in the report rather than passing it.
Conducive conditions and building findings recorded at Box Hill addresses.





New Construction Stage Inspections Seven checks through a Box Hill build, each timed before the work is closed in.
Pre-Handover (PCI) Inspections The final list while the last payment is still yours to hold.
Defect Investigation Reports One failure, traced back to what the drawing actually required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of the established homes around Box Hill. Instant online pricing, or talk to the booking team on 1300 471 805.
Because moisture is half the invitation. A subfloor that stays damp through winter, usually from poor ventilation or water running under the house, gives termites the conditions they want next to the timber they want.
No. Keeping those two roles apart is intentional. Treating, and whatever warranty comes with it, is a licensed pest controller's work. We describe what is present so you can brief one properly.
No. It means nothing was visible in the areas we could reach, on that day. Termites work inside timber and behind linings, so certainty is not available to any inspector, and anyone offering it is exceeding their standard.