Fixing stage inspection in Box Hill

Joinery and mouldings on, painter not started, wet area items due to be closed out.

  • After mouldings, doors and joinery, before the painter
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Box Hill inspectionSend the address and the stage.

Fully licensed & accredited

Stage5 of 7
When to bookAfter mouldings, doors and joinery, before the painter
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2017 and your contract selections

What is included in a Box Hill fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Box Hill builds

Fixing stage does two jobs. It checks the carpentry and the external detailing that has just gone on, and it confirms the waterproofing items raised earlier were genuinely rectified before tiling covered them. The external findings here run to weep holes never formed in the brickwork, weep holes sitting below the minimum height above the adjacent ground, window infills incomplete and downpipes left unsecured.

What we find at this stage in Box Hill

  • No weep hole found in a run of brickwork
  • Weep holes below the minimum height above ground
  • Window infills incomplete
  • Downpipes not installed or not secured
  • Eaves and fascia not level or loose
Ground floor downpipe not installed, Box Hill
Ground floor downpipe not installed
Sample findings

Sample defects found during our fixing inspections in Box Hill

Annotated findings from Fixing inspections on Box Hill builds. Client addresses withheld.

No weep hole found, recorded during a fixing stage inspection in Box Hill
No weep hole found in the brickwork
Weep hole minimum height from the adjacent ground, recorded during a fixing stage inspection in Box Hill
Weep hole below the minimum height
Infills incomplete, recorded during a fixing stage inspection in Box Hill
Window infills left incomplete
Downpipe not secured, recorded during a fixing stage inspection in Box Hill
Downpipe not secured

The other stages of a Box Hill build

  1. Bored piers inspection in Box Hill1Bored piersAfter boring and cage placement, before any concrete
  2. Slab pre-pour inspection in Box Hill2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Box Hill3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Box Hill4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Waterproofing inspection in Box Hill6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Box Hill7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Box Hill →

Guides

Construction stage guides for Box Hill

All guides →

Book a fixing inspection in Box Hill

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Box Hill: common questions

What does a weep hole do?

It lets water that gets into the cavity drain back out, and it lets the cavity breathe. A brick wall without weep holes holds water against the frame behind it, which is a slow and expensive problem.

Why does the height above ground matter?

A weep hole below the adjacent ground level admits water instead of releasing it, and it bridges the barrier the clearance was there to provide. The standard sets a minimum for both reasons.

Is fixing the same as the waterproofing stage?

They overlap and often run as one visit, but they answer different questions. Waterproofing is about the membrane before tiling; fixing is about the carpentry, the external detail and closing out earlier items.

Why inspect before the painter?

Once paint is on, the gaps, joints and knocks that this stage exists to find disappear. After painting the same defects are still there and much harder to evidence.

How much time does it take?

Around two to three hours on a typical home, and the report lands that day or first thing the next.

Is it worth booking if I already have a handover inspection?

On most builds yes, because fixing stage is the last point at which wet area work can still be corrected cheaply. By handover the tiles are down.

CallGet a Free Quote