The inspection that happens while the final payment is still in your hands.
A handover inspection is assessed against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3500 for plumbing and drainage, AS 3740 for wet areas and AS 3700 for masonry.
0 checkpoints across 0 areas on a standard Box Hill pre-handover (PCI) inspection. On a site under construction we need the lot open and the builder told we are attending. Where a stage is not complete we record that in the report rather than passing it.
Recorded at practical completion on Box Hill homes.








New Construction Stage Inspections Seven checks through a Box Hill build, each timed before the work is closed in.
Defect Investigation Reports One failure, traced back to what the drawing actually required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of the established homes around Box Hill.
Building and Pest Inspections One attendance covering both, with the pest findings kept in their own report. Instant online pricing, or talk to the booking team on 1300 471 805.
Two to three weeks. That leaves the builder time to rectify and you time to check the rectifications, instead of arriving at settlement holding an open list.
Because the second gutter was never sized to take the first one's flow. In a heavy storm it backs up, and a box gutter that backs up puts water inside the roof rather than outside the building. It is a design and installation fault, not a maintenance item.
Electrical work is neither energised nor tested, plumbing is not pressure tested, appliances and motors stay off, and nothing gets opened up. Those limits are what keep the report defensible on everything it does cover.