Why cladding needs a gap above the ground
A clearance is a barrier, and building up against it removes both.
In short: Masonry too close to the adjacent ground on a Box Hill property, and what that lets in.
What the clearance does
It keeps masonry and cladding out of ground moisture and leaves a visible zone where termite activity would have to show itself.
What we recorded
Cladding to ground clearance below the minimum on a Box Hill house, alongside subfloor dampness in the same property.
How it usually happens
Landscaping. Soil, paving or a new path gets built up against the wall years after the house was finished.
The two consequences
Moisture wicking into the wall, and a concealed path for termites that bypasses the inspection zone.
Fixing it
Cutting levels back rather than anything structural. It is usually landscaping work and it is worth doing.
Written by the Owner Inspections team from inspections carried out in Box Hill. Licensed building practitioners, NSW Fair Trading licence 366177C.